Otto 175 hp Gas Engine - Page 5

 
Installing Upper Gear

Installing the top half of the gear. Chris Austin on the forklift and Doug Fye doing the placing. It is now bolted to the shaft.

Pump Installation

The pump awaiting the installation of the connecting rods and crossheads. It is very impressive.  

Pump Manifold

The pump is now assembled and operating from the engine.

Pump Crankshaft

This view of the pump shows the pinion shaft from the engine, the herringbone reduction gearing, the crankshaft, and the connecting rods for the three pump plungers.